CAREER
CARE
0
You have 0 new notifications.
View all
0
You marked 0 questions as favorite.
View all
Login
Question: A takes thrice s long do a price of work, as B takes. A&B together can finish a price of work in 15 days. A long can do it in-
Home
Question: A takes thrice s long do a price of work, as B takes. A&B together can finish a price of work in 15 days. A long can do it in-
Question 1: A takes thrice s long do a price of work, as B takes. A&B together can finish a price of work in 15 days. A long can do it in-
View topic: বিবিধ সমস্যা (Miscellaneous Problem)
15 days
25 days
45 days
60 days
Source: সমন্বিত ৬ ব্যাংক ও আর্থিক প্রতিষ্ঠান - সহকারী প্রোগ্রামার - 18.03.2021
Answer
Favorite
Answer: 60 days
Explanation:
Write Reply...
You should read
| Questions
If one number exceeds another number by 12 and the smaller number is 1/3 time the larger number, then the larger number is :
.1×.01×.001.2×.02×.002-এর মান কত?
১৪৪ কোন সংখ্যার ৪০%
If x=5y =16 and x=-3, then the value of y is ----
xy এর সাথে কত যোগ করলে যোগফল 2yx হবে?
তুহিনের জন্ম তারিখ ২৬ জানুয়ারি ১৯৮৯। ২৬ নভেম্বর ২০২৩ সালে তার বয়স কত হবে?
In 2007, the arithmetic mean of the annual incomes of Rahim and Karim was Taka 3800 . The arithmetic mean of the annual incomes of Karim and Ripon was Ripon and Rahim was TaKa5800. What is the arithmetic mean of the incomes of the three ?
a+b=4; a-b=2 হলে a2+b2=?
In how many ways a team can be constituted so that the team includes Nadir?
৯০° কোণের সম্পূরক কোণ কত ডিগ্রি?
View all Questions
You should read
| Topic
ক্রম ও ধারা (Sequence & Series)
শতকরা ও লাভ-ক্ষতি (Percentage and Profit and loss)
ভাষা আন্দোলন ও মুক্তিযুদ্ধভিত্তিক সাহিত্য
অসমতা (Inequality)
বিপরীত শব্দ
বিশ্ববিখ্যাত টেক জায়ান্ট
নৈতিকতা, মূল্যবোধ ও সুশাসন
বিখ্যাত গ্রন্থ ও সাহিত্যকর্ম
English Literature
সময়, দূরত্ব ও গতিবেগ (Time, distance & speed)
Articles
0
Comments
0
Rating
0
Login